UWE’s Bristol Frenchay campus gets 900 new student rooms

Aim Acoustic & Insulation Manufacturing has supplied wall cavity barriers and open state cavity barriers (OSCBs), along with technical support, for a 900-room student accommodation development at the University of West England Bristol’s Frenchay Campus.

The new-build, low-carbon design development, which includes three buildings, six stories high, is to help meet demand from students for high-quality on- campus accommodation. The first rooms became available from September 2023. Designed by Stride Treglown, the project’s main contractor is Vinci Construction. AIM worked with Maple Sunscreening on the rainscreen façade system assembly from the ground floor upwards, which is mainly cassette panels with AIM’s OSCBs incorporated horizontally and AIM’s wall cavity barriers installed vertically.

Maple designs, manufactures and installs solar shading, weather protection and screening for building exteriors and interiors – and is best known for architectural façades, louvres, brise soleil and rainscreen cladding systems. AIM also supplied and supported installers Sandford Building Contractors during the construction of the extruded polystyrene (XPS) filled sub-floor cavity, which included a layer of AIM’s wall cavity barrier directly above the XPS, and all two masonry storeys. AIM won the business after supplying barrier samples for BS 8414 mock up fire testing, which was successful. AIM’s products were supplied through SIG Manchester. On multiple occasions, AIM attended site to provide product training and technical assistance. Joe Hemming, senior project manager for Maple Sunscreening, said: “Maple’s commitment to the highest level of quality installation and recording has proved vital in maintaining confidence with the client. To date Maple’s on-site team have worked closely with AIM and the client to deliver product training with certification for over 60 operatives and managers currently work on this project.

This is now reflecting within Maple’s and AIM’s quality audits.” Designed for use within ventilated rainscreen facades and timber frame cladding systems, AIM’s OSCBs allow free airflow and drainage and improve fire safety, providing fire resistance of up to two hours insulation and integrity in suitably supporting structures. In the event of a fire, heat activates an intumescent strip which expands quickly to fully close the cavity. Manufactured from high density Rockwool stone wool and faced with the higher performance intumescent strip, AIM’s OSCB range provides either a 60 or 120-minute rating for both integrity and insulation. The OSCBs are an effective barrier to the passage of hot smoke as well as fire. The AIM range has been tested to TGD 19 and the general principles of BS EN 1363-1. They have been exposed to BS 8414 Fire performance of external cladding systems fire tests and assessed to BR135 to achieve pass results with a variety of third- party cladding systems.

The range has been tested in masonry constructions to establish the performance of the product itself and non-standard constructions representing site conditions. AIM wall cavity barriers are made from foil-faced high-density Rockwool stone wool and are suitable for use in all masonry cavity walls, as well as for fire stopping between a masonry curtain wall system and a concrete floor slab. The barriers prevent the passage of heat, flame and smoke within the cavity they fill for one- or two-hour fire-resistance rating periods. They are tested to BS 476-20. The barriers also reduce airborne transmission of sound by a minimum of 21db Rw. William Liew, Chief Financial Officer of UWE Bristol, has described the new accommodation as a “path-breaking project which will set new standards for sustainable development at-scale and provide accommodation and social facilities of the highest standard for our students.”

 

www.aimlimited.co.uk

www.maplesunscreening.co.uk

www.stridetreglown.com

www.stridetreglown.com

Related Stories
Bishop Luffa School in Chichester upgrades fencing in major refurb
To keep the buildings secure, Jacksons Fencing was chosen to install new perimeter fencing and gates, incorporating swipe-access readers to give the school greater control over entry and exit to the school site.
Returning to school – returning to normal
Government permitting, Stable Events will be holding their 11th education building forum on 12th & 13th November 2020 @ The Belfry.
TG Escapes providing free building designs to support future CIF bids.
Not every Condition Improvement Fund (CIF) bid can be successful and many schools will be disappointed with the outcome of the latest round. If you are planning to apply for the next 2020/21 round of CIF bids, then TG Escapes can help strengthen your application by providing free architectural designs.
Offsite construction specialist
Offsite construction specialist TG Escapes offer a free site survey and bespoke building design to all customers in education. This service can help schools explore ideas and visualise what can be achieved with a timber frame building without obligation.
FAST FIT – THE NEED FOR SPEED
It’s an unavoidable fact that refurbishment projects will often lead to downtime. However, when it comes to our country’s education buildings, this can cause a real headache. Here, Lewis Cooper, Segment Marketing Manager for the Education sector at Forbo Flooring Systems, explores how choosing flooring solutions that can reduce the amount of downtime and can be installed in shorter time windows are essential in such applications.   

Login / Sign up