Academy Enhances Corridors with the Help of Yeoman Shield 2

MacMillan Academy, responsible for the care and education of 1500 11- 18-year olds, undertook during the summer of 2019, a large project to further refurbish many corridors within its central building, with the help of Yeoman Shield wall protection products.

As a campus site the Academy’s central building is one of the oldest dating from around 1940 and in a bid to meet today’s expectations and blend seamlessly with the newer, fresher facilities it was key to find a solution which both enhanced the overall appearance, whilst also ensuring hardwearing durable areas were achieved.

Having provided quality products and services to a previous project for Macmillan Academy, Yeoman Shield were first choice for the provision of wall protection on this latest refurbishment.

Yeoman Shield’s directly employed fixing operatives installed wall protection panels along corridors to protect from costly to repair impact damage and marking.

Along department corridors Yeoman Shield digitally printed protection panels with relevant subject names, text and images were portrait fitted at full height giving an informative yet vibrant design.

Where required, 50mm dia. Guardian Handrails in contrasting colours were installed with Stainless Steel handrails being utilised for stairways and slopes. 200 mm protection rails were fitted to white walls, not only for impact protection but to provide interest with a colour contrast.  

“The finish of Yeoman Shield products not only provides us with a hardwearing solution but has also been used to visually enhance the corridors. We were excited to install the bespoke printed panels, handrails and protection rails, all of which added to the visual appearance of the finished products.” Explained Mrs Jackson, Estates Director at Macmillan Academy.

Yeoman Shield’s wide choice of colours also allowed The Academy to pick wall panels to match bespoke signage frames, supplied by The Horizon Group, resulting in stunning wall displays.

“Yeoman Shield expertly managed all aspects of the project; from initial quotation stage, to installation to the project sign-off, they adapted to fit our work schedule to ensure all works were completed for the first day of the new term. Again, the dedicated team were super-efficient and met with all our H & S requests.

“Overall an outstanding project which has provided sustainably manageable corridors, which we are sure will stand the test of time.” Concludes Mrs Jackson.

 

For more information on Yeoman Shield wall & door protection products go to www.yeomanshield.com      

Related Stories
‘Open or shut?’ confusion over Government’s covoid-19 policy
Construction work at some English and Welsh schools was continuing as Education Design and Build went to press, but with the coronavirus escalating fast, pressure was mounting on the Government to order a total close-down.
Universities and built environment professionals battle to survive
As Higher Education Estates went to press, Britain’s universities were continuing to operate but only on a highly restricted basis.
Returning to school – returning to normal
Government permitting, Stable Events will be holding their 11th education building forum on 12th & 13th November 2020 @ The Belfry.
SEND school-building surge with 35 in operation by late 2022
THIRTY-FIVE new schools are to be built for children with special educational needs and disabilities (SEND), the government has announced.
EDUCATION ROUNDTABLE: A LESSON IN LIFE SAFETY FROM HOCHIKI EUROPE
Leading life safety manufacturer, Hochiki Europe, has hosted a virtual roundtable in which experts discussed the pressing issues that surround life safety in our educational facilities. The online panel talk, available to watch online, comes as part of the manufacturer’s efforts to uphold high standards within the fire safety sector and support its industry partners in doing the same.

Login / Sign up