Site Logo
Cladding triumph at St Albans School’s new STEM centre

PROTEUS Facades has created an attractive effect on the external façade of a new-build mathematics facility at St Albans School in Hertfordshire, using its glass cladding panels and digital screen printing facilities.

In recent years the school has experienced a consistently increasing take-up of science, technology, engineering and mathematics (STEM) related subjects by pupils. However, it was found that there was a lack of existing, fit-for-purpose space to house and support the growth and teaching of these subjects at the school.

The new Corfield Building at St Albans School replaces a now demolished wooden cabin-like structure to address this need. Designed by PHP Architects and developed by Borras Construction, it includes a bespoke two storey maths facility on the upper ground and first floors along with a Combined Cadet Force (CCF) shooting range and office space within the lower ground floor.

A key requirement for the design of the new structure was to ensure that the outside aesthetics showcased the state-of-the-art facilities within and the leading reputation that the school has for its STEM programme.

To achieve the required aesthetic and taking inspiration from the old black boards and white chalk used in schools many years ago, PHP Architects specified bespoke Proteus GL 4mm back-painted glass cladding panels with a unique, screen-printed monochrome mathematical design.

Using state-of-the-art glass processing facilities, the glass was fabricated with a two layer digital screen-print effect. An initial white application was applied, and CNC control printed with the mathematical symbols. A solid secondary black back-painted layer was then added to create the black board effect. The featured arrangement of mathematical and geometrical symbols, shapes and equations represent those used within theories and formulas covered as part of the core subject.

While the principal of designing a black board for the external elevation sounds simple, it creates a number of challenges. The most prudent being developing a product that can both achieve the required aesthetics and have the strength and durability to withstand external environmental conditions such as harsh weather.

As glass is a completely inert material, Proteus GL was the ideal choice as it provides a virtually unlimited lifespan because it is rust and corrosion free. In addition, as the system is available in almost any RAL colour or bespoke digitally screen printed options, the material offers architects a wealth of design options, while providing a product that is colourfast, resistant to UV rays and fully tested and compliant with CWCT Standards.

Proteus GL is an integrated modular rainscreen cladding system with an aluminium honeycomb core structurally bonded between a toughened back painted glass face and a lightweight metal rear skin. The system has been tested to EN13501 and achieves an A2 fire rating. It is also lightweight, being up to 33% lighter than the closest glass rainscreen system.

Each panel, installed by Craft Interiors, is supported by the unique Proteus system of aluminium carriers and ancillary components, which can be installed on to any type of wall construction, with no visible fixings, creating a sheer, smooth façade.

Commenting on the design and development of the new structure at St Albans School, a representative of the School said: “As well as significantly improving the home of our ever-popular CCF unit, this development provides our Maths Department with a new building worthy inside and out of its outstanding results.”

www.proteusfacades.com  

www.peter-haddon.com  

www.borrasconstruction.co.uk  

Related Stories
Bishop Luffa School in Chichester upgrades fencing in major refurb
To keep the buildings secure, Jacksons Fencing was chosen to install new perimeter fencing and gates, incorporating swipe-access readers to give the school greater control over entry and exit to the school site.
Returning to school – returning to normal
Government permitting, Stable Events will be holding their 11th education building forum on 12th & 13th November 2020 @ The Belfry.
TG Escapes providing free building designs to support future CIF bids.
Not every Condition Improvement Fund (CIF) bid can be successful and many schools will be disappointed with the outcome of the latest round. If you are planning to apply for the next 2020/21 round of CIF bids, then TG Escapes can help strengthen your application by providing free architectural designs.
Offsite construction specialist
Offsite construction specialist TG Escapes offer a free site survey and bespoke building design to all customers in education. This service can help schools explore ideas and visualise what can be achieved with a timber frame building without obligation.
FAST FIT – THE NEED FOR SPEED
It’s an unavoidable fact that refurbishment projects will often lead to downtime. However, when it comes to our country’s education buildings, this can cause a real headache. Here, Lewis Cooper, Segment Marketing Manager for the Education sector at Forbo Flooring Systems, explores how choosing flooring solutions that can reduce the amount of downtime and can be installed in shorter time windows are essential in such applications.   

Login / Sign up