 |
Vanity Unit Kits - Cubicle Centre Limited |
Made to measure vanity unit kits available as either Inset (550mm deep) or Semi-Recessed (350mm deep) options.
Standard vanity tops available from Cubicle Centre Ltd are 20mm thick with a High Pressure Laminate (HPL) finish, with under panels constructed from high performance MFC as standard.
Cubicle Centre’s unique design removes the need for a timber frame, saving you both time and money. | |
|
|
|
|
 |
Bournside School Benefits from Pictura Cladding - Marley Eternit |
A new Learning Resource Centre at Bournside School in Cheltenham has been given a stunning modern design with help from Pictura fibre cement rainscreen cladding.
Pictura has a beautiful, hard, smooth, silky, matt surface with a UV cured top layer that offers good protection against many types of staining - providing a long term low maintenance solution for the school. | |
|
|
|
|
 |
Tuke School in London is Completed - Dan Pal (UK) |
Tuke School in London is now completed with Dan Pal (UK) supplying an insulated double wall system. Using 1040mm wide clear and Ice panels the Danpalon vertical wall was installed expertly for the Southwark School. The Danpalon system lends itself to any application and is robust and easy to install making it perfect for educational facilities. | |
|
|
|
|
 |
Steni Cuts its Cladding Competitors Down to Size - Steni |
Steni’s unique ability to factory-cut panels to size has won over yet another architectural practice after it specified Steni’s Colour rainscreen cladding for a multi-million pound school project in York. Seven colours are being used in a stunning diagonal design on a creative media centre designed by Morgan Lloyd Jones. | |
|
|
|
|
 |
DORMA for Education & Schools - DORMA |
DORMA provides solutions for education projects. We can advise which products meet the strict performance criteria for the Department for Education and Schools.
Each product in the DORMA Education & Schools brochure is manufactured to the highest standards for longevity, value and compliance – making them ideal for educational establishments. | |
|
|
|
|
 |
Cutting Costs not Corners - Wernick Modular Buildings |
- More cost-effective than traditional methods of construction
- Up to 50% faster to complete
- Choice of traditional external finishes, if required
- Single classrooms to complete schools
- High sustainability factor when compared to traditional build
- Design and build and full project management available
- Hire or purchase options available
| |
|
|
|